BLT Companies' Ready Mix concrete production facilities are certified by the National Ready Mixed Concrete Association. The plants operate with fully automated Command Alkon central dispatched with a combined continuous production capability of 800 cubic yards per hour.

Ready Mix

Plant #1 - ADOT #2041 - YUMA

Con-E-Co Stationary Transmit Mix Batch Plant. Two cement storage silos, gravity cement batcher, gate discharge aggregate batcher and basic aggregate storage Batch Capacity 12 cubic yards/200 yards per hour.

Plant #2 - ADOT # 2141 - WELLTON

Con-E-Co Stationary Transmit Mix Batch Plant. Two cement storage silos, gravity cement batcher, gate discharge aggregate batcher and basic aggregate storage Batch Capacity 12 cubic yards/200 yards per hour.

Plant #3 - ADOT # 437 - FOOTHILLS

Con-E-Co Stationary Transmit Mix Batch Plant. Two cement storage silos, gravity cement batcher, gate discharge aggregate batcher and basic aggregate storage Batch Capacity 12 cubic yards/200 yards per hour.

PLANT #6 - ADOT # 2265 - SOUTH COUNTY

Con-E-Co Stationary Transmit Mix Batch Plant. Two cement storage silos, gravity cement batcher, gate discharge aggregate batcher and basic aggregate storage Batch Capacity 12 cubic yards/200 yards per hour.

Plant # 7 - ADOT # 2041 - PORTABLE PLANT

Con-E-Co Lo-Pro Transit Mix Portable Batch Plant. Two cement storage silos, gravity cement batcher, gate discharge aggregate batcher and basic aggregate storage Batch Capacity 12 cubic yards/200 yards per hour.

Concrete Calculator

Material Volume

Width

Feet

Length

Feet

Thickness

Cubic Yards

NOTE: This Calculator should be used as an estimating tool ONLY. BLT Companies is not responsible for any discrepancies in material based on calculations made with this application.

 

Find Your Ready Mix Colors

Click Here to Download the Color Chart: 
Download Color Chart
 
Click Here to Learn More

TERMS & CONDITIONS

  • Drivers are not permitted  to add water to mix, unless by customer's written authorization. Water added to concrete will reduce its strength, any water added is at customer's risk.
  • Curb release: Drivers are prohibited from delivering concrete beyond the curb line, unless by customer's written authorization acknowledging acceptance of risk for any loss or damage to the property or our equipment, including wrecker/towing charges. By signing the Curb Release section on the delivery ticket, customer acknowledges and accepts that BLT assumes no responsibility for damages inside the curb or property line. 
  • Customer agrees to the terms of sale and delivery and accepts concrete as is.
  • Drivers can only deliver materials using the truck's own power and are only permitted on sites where conditions are safe and allow for the proper operation of the equipment.
  • Due to factors beyond our control, such as wind or other acts of God, BLT and its entities are not responsible for the finished results of concrete, asphalt or materials after delivery.
  • BLT and its entities are strictly material suppliers and are responsible for concrete strength, yield, slumps and timely delivery and therefore, not responsible for subgrade, compaction and moisture, which can result in cracking or yield problems.
  • No credit will be given for unused concrete, asphalt or materials. 
  • Stand-by: BLT allows for 6 minutes per cubic yard of concrete for unloading time at no additional charge; any additional time will be billed at a rate of $1.00 per minute. 
  • All concrete deliveries are for no less than the value of 4 cubic yards. 
  • A fuel surcharge will be applied to each delivered load, based on the daily rate as per United States Energy Information Administration. 
  • Commodities used in the production of concrete and asphalt, such as oil, cement, aggregates, chemical, fuel, etc., have recently become very unpredictable, volatile, and often times, scarce. Prices are subject to change without notice due to increases in the cost of materials, including, but not limited to, cement, asphalt, oil and fuel. 
  • Any requested mix design that deviates from BLT's standard mix design and specifications is subject to an additional fee.
  • We respectfully request proper notice, at least 30 days, prior to starting a job, in order to produce the material as parts and equipment are simply not as readily available during breakdowns/maintenance situations as they have been in the past. Please do not assume that a product you need will be available without notice.
  • If a temperature spec is required for the project, BLT reserves the right to cancel or decline scheduling any pours due to excessive weather forecast to include heat, wind, thunderstorms, etc. BLT will abide by ASTM C-94, ACI 305.1-14, ACI 301-16 and ACI 305R for hot weather concrete of 95 degrees F at the time of discharge.
  • In the event of a scheduled Plant Dedication pour, BLT must be notified of cancellation by 5 PM the day prior to the scheduled pour, otherwise, a Cancellation Fee of $2,000 applies. During normal scheduling (5 AM to 4 PM, Monday through Friday), if customer cancels an order after the concrete has been batched, customer will be charged for the concrete that has been batched.
  • It is the responsibility of the customer to verify the mix has been approved by the owner of the job. 

General Provisions

  • All price quotes are based on standard BLT mix designs and specifications, unless otherwise noted, and depend upon supply and availability.  Prices are subject to change without notice due to increases in the cost of materials, including, but not limited to, cement, asphalt oil and fuel.  
  • Price quotes expire as of the date expressly written on the bid or, if no expiration date is provided, 30 days after the date of the quote.
  • Quoted prices are subject to change, even after Buyer/Contractor has accepted the bid, where any change is made to the specifications originally relied upon by BLT to provide the quoted price, including, but not limited to, circumstances where the quoted job is underway and/or change orders are received.
  • Price quote are only quotes and are not intended to serve as a contract or purchase agreement, and does not commit BLT to perform or execute the quoted job.
  • If Buyer/Contractor cancels a job on the day of, cancellation fees may apply regardless of the reason for the cancellation.
  • Under no circumstances shall Buyer/Contractor retain any monies due to BLT Companies.
  • All products are to specifications at BLT's production site.
  • All roads must be passable with trucks.
  • Jobs and/or orders placed over the phone may be voice recorded. 
  • A three point twenty five percent (3.25%) surcharge will be applied to credit card payments.

Restrictions & Exclusions

  • All quotes exclude:  placing of concrete; quality control, and any other testing, on any and all jobs including mix designs; bonding; sales tax; and compliance with all federal, state, local and tribal laws and regulations, including, but not limited to, the Davis-Bacon Act and other wage provisions.
  • BLT's responsibility is limited to supplying goods with proper mix weights (i.e., PSI and Slump).  BLT is not responsible for any other issues, including, but not limited to, dusting, cracking, spalding, finish quality, pop-outs, wind cracks, crazing or any other surface issues.  Quoted prices may vary dependent on availability of non-BLT produced materials. 
  • BLT is not responsible for any specifications dealing with non-indigenous species and/or compaction on job sites. 
  • In the event of any delays or cancellations resulting from BLT's performance or actions, BLT shall not be liable for any damages or expenses, incurred by Buyer/Contractor or others, as a result of any such delays or cancellations.
  • Buyer/Contractor is responsible for all outside equipment, labor, expenses and scheduling if BLT has a scheduling or break-down conflict and equipment is needed.
  • BLT is not responsible for, and will not pay, standby fees/expenses to any Buyer/Contractor or Vendor if any plant goes down for any reason.
  • BLT is not responsible for any charges incurred in relation to rail car services, such as demurrage fees or wear and tear.

Conditions & Additions

  • Saturday concrete orders will be an additional $10.00 per cubic yard. If a concrete plant is requested to be open on a Sunday, a start-up fee of $2,000.00 may apply and a $20.00 per yard additional costs will apply. If a concrete plant is requested to be open on a holiday, a start-up fee of $8,000.00 may apply and a $30.00 per yard additional costs will apply.
  • Standby Fees:  All plants have a standby charge of $125.00 per hour.  Once a piece of equipment is on the job, the stand-by rate is $1.00 per minute after the first sixty (60) minutes for concrete trucks.
  • Any safety, environmental or other class(es), required by Buyer/Contractor or Owner, will be charged at a separate quoted hourly rate. Military base access, badge requirements, runway passes, FAA clearances, MSHA requirements or other clearances and any requirement directed by owner or contractor are not provided by BLT, will require prior notice and an hourly fee will apply.

CONCRETE ENEMY NO. 1

EXCESS MIXING WATER IS HARMFUL TO CONCRETE QUALITY. THE FOLLOWING CHART ILLUSTRATES THE STRENGTH LOSS BY THE ADDITION OF WATER IN EXCESS OF NORMAL REQUIRMENTS FOR STRENGTH AND WORKABILITY.

GALLONS OF WATER ADDED PER CUBIC YARD OVER SLUMP ORDERED

SLUMP INCREASES (INCHES)

% OF STRENGTH REDUCTION

POUNDS REDUCED P.S.I.

1   

 1/2

4 1/2

115

1 1/2

1   

6 1/2

225

2   

1 1/2

8 1/2

300

3   

2   

13   

450

4   

2 1/2

17 1/2

600

4 1/2

3   

19 1/2

675

5   

3 1/2

21 1/2

750

6   

4   

26   

900

7 1/2

5   

33   

1150

9   

6   

40   

1400

REMEMBER – QUALITY CONCRETE IS EVERYBODY’S RESPONSIBILITY

WARNINGS

EXCLUSIONS OF WARRANTIES: Except as expressly described on the face of the ticket, the parties agree that the implied warranties of MERCHANTABILITY and FITNESS FOR A PARTICULAR PURPOSE and all other warranties, express or implied, are EXCLUDED from this transaction and shall not apply to the goods sold.

  1. Purchaser acknowledges that under certain conditions, the aggregate used in producing the concrete can be alkali reactive. This reaction can have a detrimental effect on the concrete. Purchaser accepts responsibility for the results of any such reaction.
  2. Concrete is a perishable commodity and becomes the property of the purchaser upon leaving the plant. Any changes or cancellation of original instructions must be telephoned to the office before loading starts. Maximum free unloading time is 6 minutes per yard.
  3. Freshly mixed cement, mortar, grout, concrete or asphaltic concrete materials may cause skin irritation. Asphaltic concrete material may release Toxic Hydrogen Sulfide Gas. Avoid contact when possible and wash exposed skin promptly.
  4. Not responsible for any damage on delivery inside curb line. No claim allowed unless made at time of material is delivered.

CERTIFICATION

The purchaser of the items set forth on the attached invoice agrees to pay all collection costs, including reasonable attorney’s fees.

This certification is made for the express purpose of permitting the seller of said items to claim an exemption of sales tax with respect to this sale, which tax would have otherwise been charged to the purchaser in addition to the price of said items.

Concrete
Sixty percent of the 47,744 mile U.S. Interstate Highway System was built of concrete.
Heavy Load
Concrete naturally can support the heaviest loads, such as truck traffic and increasingly larger vehicles like jumbo-jets.
Bellefontaine, Ohio
America's first concrete street, built in 1891 in Bellefontaine, Ohio, is still in service today!
Certification of Crane Operators
National Ready Mixed Concrete Association
Arizona Trucking Association
The voice of small businesses
Greater Yuma Economic Development Corporation
SC&RA